Responsible for the mechanical, electrical, and plumbing design of a 14 story 336,000 SF medical office building with heliport, prosthesis laboratory and fabrication shop, hematology laboratory, dental clinic, three story 1,200 car parking garage, six story glass atrium, interior water features, and four story 58,000 SF education wing with roof garden. The project also included atrium smoke control systems, medical gas and vacuum systems, emergency power generation and distribution systems, fire detection and alarm systems, and fire suppression systems.
Features: